The roadmap, the specifications and the review — your engineers do the shipping.
If you have the engineering capacity and still are not ranking, the missing piece is usually not effort. It is that nobody is deciding what not to do. That decision is what this buys.
Every change is handed over with the reason, the way to verify it, and whether it can be reverted on its own. A specification that cannot be verified is an opinion.
This is the engagement for a company with developers, a product team and possibly a content function, where the constraint is direction rather than capacity. The deliverable is a prioritised sequence of changes, each one specified precisely enough for your own engineer to implement without asking what was meant, and a standing slot to review what shipped.
It costs more per hour than having the work done for you, and that surprises people. The reason is that it is the hours themselves being bought — judgment applied to your specific situation — rather than execution that can be scheduled around. The trade is that your team keeps the knowledge and the velocity.
It is the wrong fit if there is nobody to implement. A roadmap handed to a company with no engineering capacity becomes the same findings document that technical audits usually become, and it is better to say that at the start than to bill for it.
Sixteen hours a month is the usual shape. What fills them is yours to direct.
The roadmap is a sequence, not a backlog. Each item states what to change, why it comes before the next one, how to verify it afterwards, and what it costs in engineering time. Items get dropped when they stop being worth their place.
Specifications come as patches, change sets or written specs, whichever your team works from. They are reviewable and revertible one at a time. Nothing is specified that cannot be verified after it ships.
Review is where most of the value lands. Implementation drifts from specification in every organisation, and the drift is usually invisible until a quarter has passed. Looking at what actually shipped, against what was asked for, catches it in weeks.
Engagements where the client's own team did the shipping.
B2B SaaS · Denmark · multi-market
Impressions, six months against the previous six in Search Console. Clicks 7.79K → 9.72K over the same comparison. Average position 18.7 → 15.2.
Read the full case →Food & nutrition · 6 markets · 95% export revenue
Enquiries through the site in the first three months after the rebuild, against a baseline of zero in ten years online. Leads have continued since. Average position 13.4 at baseline, 4.7 today; monthly impressions 1,472 → 2,330.
Read the full case →Because the hours are the product. Execution can be batched, scheduled and partly automated; judgment applied to your particular situation cannot. You are also buying the thing that is hardest to replace — your team keeps the knowledge, which is cheaper over two years than renting it indefinitely.
Then the recommendation gets argued, and sometimes it loses. Your engineers know constraints that an outside consultant does not, and a specification that ignores them does not ship. What should not happen is a change being quietly dropped — that is what the review slot is for.
Yes, and it often does for a specific piece — a migration, an hreflang rebuild, something with a hard deadline. That becomes a scoped project with its own start and end rather than being absorbed into the consulting hours, so both sides can see what it cost.
You'll get an honest read on whether it's a technical problem, a content problem, a competitive problem, or not a problem worth solving. If it's the last one I'll say so — that answer costs you nothing and saves us both a proposal.